Start with the organisation, the electricity meter and how the building actually operates.

NDMG can support qualifying non-domestic solar PV proposals, but the applicant, site, works, funding history, system size and application timing all matter. The maximum published grant is not a typical award. Treat calculators as estimates, never grant approvals.

Primary and post-primary schools have several questions that a normal business solar calculator cannot answer. The building may be occupied most weekdays during term, underused during summer, funded through public education programmes, or managed by a board or patron rather than a private property owner. All of those facts affect whether a proposed array makes sense.

The first step is not deciding how many panels can fit on the roof. It is establishing which programme, applicant and meter point apply. Check whether the school has already received a publicly funded solar array and what additional approvals would be needed for any expansion.

Which solar grant or funding route should you check?

The Department of Education operates a distinct Schools Photovoltaic Programme. Its published guidance describes support for eligible schools to install up to 6 kWp of rooftop solar PV, with grid connection and monitoring. This is different from SEAI's Non-Domestic Microgen Grant and should be checked first for schools that qualify through the department's programme. Funding windows and invitations are managed separately. The Department's publicly posted second-phase timetable lists application deadlines in 2025, so do not assume a new School Hub application window is open in November 2026; school authorities should verify current Department invitations and deadlines before taking action.

SEAI also lists schools among potential non-domestic solar grant applicants. That does not mean an individual school may claim a second grant on the same panels or that it can freely choose between two funding programmes. School authorities need to confirm applicant eligibility, existing government assistance, relevant MPRNs, procurement obligations and whether any upgrade is separately eligible.

If a school is part of a broader community energy retrofit — for example, with insulation, ventilation or heating improvements — Community Energy Grant participation may be relevant through a qualified project coordinator. Do not use the NDMG 45% formula to estimate the entire retrofit.

The SEAI Non-Domestic Microgen Grant (NDMG) uses cumulative PV system-size bands, subject to a 45% cap on eligible installation costs for qualifying new applications during the published enhanced window ending 6 July 2027. The grant calculation is only one part of eligibility; the official scheme rules and your funding authority take precedence.

A worked solar grant estimate — not a price quotation

For example, imagine an independently funded 15 kWp expansion with an assumed eligible PV cost of €22,000 excluding VAT. These are deliberately hypothetical inputs, not indicative school contract prices. The calculation illustrates why the scheduled grant figure and cost cap are different.

Illustrative mathematical example using the published enhanced NDMG grant schedule. All project inputs are hypothetical.
Illustrative inputAmount
Proposed PV size15 kWp
Assumed eligible PV installation cost (ex VAT)€22,000
SEAI capacity-band calculation€10,200
45% of assumed eligible cost€9,900
Lower amount, before any additional conditions€9,900

For your own project, replace these invented figures in the live SEAI grant calculator. A supplier's detailed quotation and the applicant's exact eligibility will determine whether an application is possible and what award may be offered.

What makes this type of building different?

Term-time demand versus summer generation

Classrooms, IT equipment, kitchens, ventilation and offices use electricity mainly during the teaching day, which can coincide with sunshine. But July and August can have high PV output while school buildings are comparatively quiet. A system sized only to its roof can export much more than the school initially expects.

Request annual bills and, where available, half-hourly interval data. Distinguish teaching days, weekends, mid-term breaks and summer. If there are summer programmes, sports facilities or evening classes, include them explicitly in the load profile.

Existing solar, meter points and future projects

A school might already have a small installation through the Schools Photovoltaic Programme. Before evaluating a larger array, establish current PV capacity, inverter ratings, the contracted electricity meter, feed-in arrangement, and whether the school's governing body has permission to expand.

Future heat pumps, EV charging or extensions could change daytime demand, but an unapproved future project should not be treated as guaranteed consumption. Create scenarios with and without the proposed additions.

School roof access, safety and purchasing decisions

Roof condition, skylights, fire access, asbestos-containing materials and safe installation during school operation need careful assessment. Work on an occupied school may require safeguarding, contractor access restrictions and planned shutdowns outside teaching hours.

The school's procurement process, property ownership and delegated authority matter. Ask who can appoint designers, sign contracts, claim grant support and certify completed works before committing funds.

Installer quotation checklist

Ask more than one suitably registered installer for comparable proposals. Make sure the scope and exclusions are transparent, and obtain specialist advice for structural, safeguarding, electrical and procurement issues where relevant.

  1. Document the school authority, property owner, MPRN and any existing publicly funded panels.
  2. Use school-term versus holiday electricity figures, not a generic 80% self-consumption assumption.
  3. Identify roof survey, construction works and classroom-safe work scheduling in the quotation.
  4. Check all relevant Department of Education procurement, grant and planning conditions.
  5. Request separate costs for the eligible PV installation, roof repair, storage and monitoring.
  6. Confirm grid-connection category and SEAI eligibility before work begins.

Frequently asked questions

Does every school automatically qualify for the €325,200 grant?

No. That is the maximum published NDMG amount for exceptionally large qualifying installations, not a school entitlement. School eligibility and any overlap with Department of Education funding require checking.

Our school already received a 6 kWp solar system. Can we add more panels?

Possibly, but do not assume another public grant is available for the same meter point or installation. Confirm prior scheme conditions, remaining electrical capacity, ownership and whether a new proposal can qualify separately.

Should we size the system to the school's entire roof?

Not automatically. Summer holidays and weekends can reduce on-site use of PV production. Roof surveys, interval electricity data and realistic export assumptions are more useful than maximum panel area.

Official sources and further reading

This is independent planning information, not SEAI or government advice. Eligibility, rates and conditions can change; always check these sources before committing expenditure.