What is the key decision for a factory?

Manufacturing can be a strong candidate for on-site solar when production demand aligns with daylight generation. For 24-hour plants, the energy model should separate daytime loads, night demand and any value from exporting surplus generation instead of claiming solar directly covers every shift.

Can solar PV offset electricity used by an Irish factory?

A credible savings estimate should begin with electricity usage records and the type of equipment operating while solar power is available. Annual consumption on its own cannot tell you what fraction of a proposed system's output will be consumed on site.

  • Production lines, motors, compressed air, process cooling and ventilation may create continuous or shift-dependent electrical loads. The timing of these loads determines how much solar power can be used directly.
  • A single-shift facility operating mainly during daylight may self-consume a different share of production from an overnight factory, even with similar annual electricity use.
  • Some production processes use thermal fuel or steam rather than electricity. Solar PV offsets electricity; it does not directly eliminate every factory fuel bill.
  • High demand does not remove grid capacity limits. A proposed large PV system may involve transformer, protection, metering or export discussions with the relevant network parties.

Site checks before pricing a factory solar installation

Commercial PV design involves more than picking a panel count. The suitability of the building, available roof space, electrical connections and safety requirements can change both capacity and installed costs.

  • Obtain recent half-hourly metering data and separate production-day consumption from shutdown periods.
  • Document shift patterns, weekend operations, seasonal shutdowns and planned equipment changes.
  • Commission an appropriate structural assessment for the proposed rooftop array and check maintenance access.
  • Ask how the system will handle export restrictions, connection requirements and power-quality considerations.
  • Check safety, fire-access requirements and responsibility for electrical commissioning during an active production schedule.
  • Model any future electrification separately instead of inflating current self-consumption assumptions.

SEAI grants for factories & manufacturing in Ireland

A qualifying factory or manufacturer may be eligible for SEAI's Non-Domestic Microgen Grant. Grants are subject to the premises, applicant, installer, project and invoice conditions. Large industrial electricity users should also assess whether connection or other energy-efficiency arrangements materially change the business case.

Under the enhanced 2026–2027 NDMG terms, the grant depends on the stepped capacity schedule and is capped at 45% of eligible invoiced solar PV costs. New applications in the enhanced window must meet all scheme conditions, and work must not begin before receipt of the grant offer. The highest published grant is not a typical project award. Review the current SEAI grant guide and verify directly with SEAI.

Questions to ask installers about a factory project

  1. What percentage of projected PV generation overlaps with factory production hours?
  2. Are network studies, protection equipment and electrical-board upgrades included or provisional?
  3. Who has assessed roof structure, access and shutdown requirements?
  4. What happens if production shifts move from daytime to evening or overnight?
  5. Which system losses, downtime assumptions and maintenance costs appear in the ROI forecast?

Use the free solar PV quotation brief builder to request a consistent scope. A good installer should explain why they recommend a particular system size and show how anticipated solar output compares with actual business demand.

How should you estimate payback for factories & manufacturing?

Start with the eligible PV cost, reduce it by any indicative grant and work out estimated yearly value from on-site generation and exports, less maintenance. The resulting simple payback is a rough decision aid and should be stress-tested against changing tariffs, roof output and self-consumption.

Try your own figures in the commercial solar ROI calculator, or see a full 30 kWp worked example. For a major project, an engineering design and detailed financial appraisal are preferable to a generic online estimate. For site constraints, read our commercial roof suitability questions and Irish grid-connection answers.

Method: this is a planning guide, not a case study of a named factory. It makes no claim about average installation prices, verified savings or suitability of any specific property. SEAI scheme references are linked to the official source.