Is TAMS 3 or SEAI's enhanced grant potentially more valuable for your farm roof? Put the figures from your bill and solar quote side by side first — without speaking to a sales rep or entering contact details.
Compare farm solar grants and payback
Start with your last 12 months of farm electricity use and a proposed PV quote. See a conditional TAMS estimate beside the enhanced SEAI NDMG estimate. No login, phone number or email required.
Advanced assumptions: export, maintenance & TAMS reference costs
Check latest DAFM reference costs ↗ before relying on this screen. Costs may be limited further at approval and claim stage.
Important before making a decision
The higher calculated grant is not automatically the better or available scheme. TAMS 3 is ranked and subject to farm eligibility, eligible spend, reference costs, roof and meter rules. SEAI is also conditional, with a separate grant offer and grid process. Do not combine funding from both schemes for the same expenditure.
All values are before VAT, financing, tax allowances, degradation, inverter replacement, insurance and other project costs. Zero VAT is not automatically applicable to farm-shed solar. VAT recovery and Accelerated Capital Allowances vary by circumstances and are deliberately not deducted from the numbers. Do not treat a 3-year result as a promise.
Sources: DAFM TAMS 3 SCIS · DAFM reference costs · SEAI NDMG · Revenue farm VAT guidance. SEAI rules last checked 17 November 2026; TAMS assumptions reviewed November 2026. Always verify currently applicable terms with the administering bodies.
What does this calculator actually compare?
TAMS 3 Solar Capital Investment Scheme (SCIS) is an agricultural investment scheme with 60% support on approved eligible expenditure, a €90,000 ring-fenced investment ceiling, a 62 kWp maximum and a limit linked to documented historical farm electricity use. Applications may be subject to competitive ranking and selection. Approved expenditure is not necessarily identical to the installer quote.
SEAI Non-Domestic Microgen Grant (NDMG) is a distinct programme for qualifying business and agricultural premises. The enhanced band schedule applies to new qualifying applications during the 6 October 2026 to 6 July 2027 window, with a 45% eligible invoice cost limit and a maximum scheduled award of €325,200 at 1,000 kWp. It is not a flat 45%-of-price grant for every applicant. See current SEAI rules ↗
Does my farm electricity bill tell me the right PV size?
It is a starting point, not a system design. The annual energy charge, unit rate and previous calendar-year eligible kWh are separate inputs because VAT, standing charges, dwelling consumption and tariff structure may distort a simple bill-based estimate. A dairy farm with early-morning milking might self-consume less solar electricity than a poultry operation with continuous daytime ventilation, even if both pay a similar annual bill.
Why are the two payback figures different?
Both use the same proposed PV installation price, yield, self-consumption, energy tariff, export value and annual maintenance allowance. Only the conditional grant estimate changes. The simple payback is therefore estimated investment after grant ÷ estimated net annual electricity benefit. It excludes financing, degradation, inverter replacements and tax treatment. Cash flow before grant reimbursement can also be substantially different from the final net cost.
How do I make the estimate more reliable?
Ask your adviser for the correct TAMS reference-cost schedule and eligible historical consumption, and request an itemised PV quote from a suitable installer. Use actual interval-meter data to improve the farm self-consumption estimate. Compare installer proposals on grid application support, structural assessments, warranties and long-term maintenance — not just the headline installed price.
Next read the full TAMS 3 versus SEAI explanation, or explore solar for different farm enterprises.