TAMS 3 versus SEAI: which grant?
A side-by-side guide to funding ceilings, reference costs, historical electricity limits, application timing and the pitfalls of choosing only on the grant percentage.
Explore this guide ↗Cut through TAMS 3 and SEAI confusion. Use an independent farm solar calculator, understand what your electricity bills actually mean, and compare installers on the details that matter to your farm.
Free to use · No login · No contact details required for estimates
No two agricultural sites run the same way. The right array for a dairy parlour can be wrong for a seasonal grain-drying operation.
A side-by-side guide to funding ceilings, reference costs, historical electricity limits, application timing and the pitfalls of choosing only on the grant percentage.
Explore this guide ↗Milking-time electricity, milk refrigeration, hot-water load, shed mounting, metering and expansion scenarios.
Explore this guide ↗Ventilation, feeding equipment, continuous welfare-critical loads, power resilience and PV self-consumption.
Explore this guide ↗Seasonal drying, crop storage, pumps, power demand and why a summer PV yield can differ from a harvest load.
Explore this guide ↗TAMS 3 Solar Capital Investment Scheme offers an enhanced 60% grant rate on approved eligible investment, but the cost counted may be limited by Department reference costs, eligible invoices and the amount entered at application. There is also a €90,000 investment ceiling and an upper limit on PV capacity and qualifying historical farm consumption. Not every valid application is selected for funding.
SEAI's Non-Domestic Microgen Grant instead uses a capacity-based stepped grant schedule, with an enhanced 45% eligible-cost ceiling for certain new applications during the 2026–27 window. SEAI covers systems up to 1,000 kWp under its grant schedule, which could make it relevant to larger farm expansion projects. Both programmes have eligibility rules, approvals and site constraints. Compare the actual conditions.
Many farms have ample shed area but less electricity demand while panels are generating than their annual bill suggests. An installer should confirm which buildings share the MPRN, the roof's structural and surface condition, safe access, shade, fire routes, network connection limits and planned increases in electricity demand. Older fibre-cement or suspected asbestos roofs need appropriate professional assessment, not speculative mounting proposals.
Installed DC kWp, AC inverter size, location-specific yield, time-matched self-consumption, export limit and metering assumptions.
Which grant route is proposed, eligible installation scope, who prepares applications, and whether work starts only after the relevant approval.
Structural assessment, fixings, roof warranties, grid application, safe access and isolation equipment.
Monitoring platform, equipment warranties, inverter response, maintenance terms and support in your area.
Our installer quote brief can help you ask suppliers comparable questions before making a decision.
This site is not affiliated with SEAI, the Department of Agriculture or an installer. It does not guarantee that any farmer receives TAMS or SEAI funding, and a payback estimate should be checked against actual project costs and electricity data. For authoritative scheme details consult DAFM's TAMS SCIS guidance and SEAI's NDMG rules.