The enhanced Non-Domestic Microgen Grant (NDMG) supports eligible solar PV systems up to 1,000 kWp. For new applications from 6 October 2026 to 6 July 2027, SEAI publishes higher stepped grants. Actual payment is limited by the application's grant value and a 45% cap on eligible invoiced installation cost. A grant letter must be received before starting work.
Which solar panel grants are available to Irish businesses?
For most eligible business solar PV projects, the key scheme to investigate is SEAI's Non-Domestic Microgen Grant. It covers qualifying non-domestic solar electricity generation rather than domestic household installations. A school, farm, manufacturer or community organisation may have different circumstances, but all need to satisfy the same scheme conditions.
This guide brings together the commercial solar grants Ireland questions people search for: current funding, qualifying sectors, cost caps and deadlines. For the formal MPRN, building, contractor and State-aid rules, use the dedicated NDMG scheme guide. Already know your proposed PV capacity? Our SEAI business solar grant calculator estimates the schedule and cost ceiling.
How much is the SEAI business solar grant?
The amount is calculated from the photovoltaic system's rated peak output in kWp. Grant bands are cumulative, meaning capacity in each band attracts that band's rate. Do not multiply the entire system size by the highest rate.
| Solar PV system size | Scheduled grant |
|---|---|
| 4 kWp | €4,800 |
| 7 kWp | €5,400 |
| 15 kWp | €10,200 |
| 20 kWp | €13,200 |
| 30 kWp | €17,200 |
| 50 kWp | €25,200 |
| 100 kWp | €45,200 |
| 200 kWp | €85,200 |
| 500 kWp | €175,200 |
| 1,000 kWp | €325,200 |
The published enhanced schedule is €1,800/kWp for the first 2 kWp, €600/kWp from 2–4 kWp, a €4,800 plateau at 4–6 kWp, then stepped rates of €600/kWp from 6–20, €400/kWp from 20–200 and €300/kWp from 200–1,000 kWp. The maximum above 1,000 kWp remains capped at €325,200 on the first 1,000 kWp, subject to other rules.
Why might the grant paid be lower than the table?
SEAI applies an eligible-cost ceiling. The payment is the lower of the amount on the application summary and 45% of eligible invoiced installation cost. Supplementary items such as batteries outside the standard qualifying solar PV system are excluded from the eligible invoice basis.
Worked example: suppose a qualifying 30 kWp proposal has eligible PV installation costs of €36,000 excluding VAT. The schedule indicates €17,200, but 45% of €36,000 is €16,200. Under those assumptions, the indicative grant cap is €16,200 — not €17,200. This is a mathematical illustration, not an installer quotation or approval.
Try your own proposed system size and eligible cost in the free commercial solar grant and ROI calculator.
Estimate the grant with a dedicated commercial solar calculator
For a quick estimate, start with the system's DC capacity in kWp and the part of your installation quote that meets SEAI's eligible-cost rules. The commercial solar grant calculator applies the enhanced stepped schedule and then the 45% eligible-cost ceiling. It is focused on grants, so it does not ask for an electricity tariff or assumptions about future export revenue.
Our separate business solar ROI calculator examines estimated financial payback once you have realistic energy generation, consumption and maintenance assumptions. A grant estimate and a return-on-investment estimate answer different questions: one concerns State support, the other the overall business case.
Who is eligible for the non-domestic solar PV grant?
SEAI lists businesses, agricultural enterprises, public bodies, schools, community centres and non-profit organisations among the eligible categories. The application guide contains conditions beyond business type, including that the relevant premises were built and occupied on or before 31 December 2024.
Other conditions include requirements concerning the applicant's financial circumstances, compliance with scheme rules and the use of a registered company and installer. Support is normally available once per electricity meter point reference number (MPRN), rather than unlimited awards at the same meter point.
Can an agricultural business apply?
The agricultural sector is explicitly included, but farmers must check that their premises, installation, other public supports and state-aid circumstances meet the actual application rules. Don't assume a project qualifies for multiple grant schemes simultaneously. A farm with a domestic MPRN may require specific evidence of a registered business being supplied by the installation.
Is the scheme only for systems below 1 MW?
The grant schedule covers the first 1,000 kWp of an eligible installation. SEAI's guide states that no extra support is paid for capacity above 1,000 kWp. Technical feasibility and grid arrangements are separate questions from the maximum grantable capacity.
Which business sectors could benefit from solar PV grants?
Grant eligibility does not depend on finding a separate funding scheme for each industry, but the technical and commercial considerations differ. A factory with daytime production can use substantial PV generation, while a chilled warehouse has around-the-clock demand. Farms must check meter and business-use arrangements, and hospitality sites should model seasonal occupancy.
See our sector guides for factories and manufacturing, warehouses, dairy farms, cold storage facilities and hotels. Each explores separate roof, electricity usage and procurement questions rather than treating the grant as the only reason to install solar.
When is the enhanced commercial solar grant deadline?
The published enhanced application window runs from 6 October 2026 through 6 July 2027. SEAI states the higher rates apply to new applications in that period; previous offers are not retrospectively increased. An application or installation outside that window cannot automatically use today's enhanced grant schedule.
Because grant programmes and application conditions can change, always check the official SEAI page and the latest application guide before making a financial decision. We last reviewed the figures on 17 November 2026.
How does a business apply for the SEAI grant?
Find companies on SEAI's register, discuss your roof and electricity use, and compare the same scope before choosing your preferred company.
SEAI requires an offer before work begins. Its published process calls for choosing and contracting with an installer before the grant application, but not starting the installation in advance.
The installer manages the appropriate connection application or notification. Timing and technical conditions depend on the proposed system.
After approval and installation, the registered company supplies the required documentation. Actual grant payment is subject to verification of costs, works and scheme conditions.
The SEAI guide describes an eight-month validity period for grant offers. Allow time for grid procedures, installation and documentation. Don't treat a calculator estimate as a reserved grant.
What costs should be checked in the grant application?
Obtain a clear breakdown of the standard solar PV works, ineligible extras, VAT treatment and any necessary electrical upgrades. A system may have an attractive total quote but a smaller eligible invoice base than expected. The amount shown by our calculator is only as good as the eligible-cost figure you enter.
The solar installer quote checklist helps you ask several providers for comparable information, and the commercial solar payback guide explains how a grant changes the investment calculation.
Six checks before requesting commercial solar quotes
Establish landlord or owner permission, access rights and expected roof life before committing to a long-lived installation.
Ask for a forecast using real operating hours and consumption data rather than assuming every generated kWh will be used onsite.
Check both company and installer against the relevant SEAI register.
Request separate line items for standard PV works and batteries, roof repairs or other additions that might not qualify.
Confirm the applicable grid process and any provisional charges before accepting a payback estimate.
The enhanced application window has an end date. Confirm the current schedule and obtain the actual offer before beginning work.
Frequently asked questions
Is “SEAI commercial solar grant” the same as the Non-Domestic Microgen Grant?
“SEAI commercial solar grants” and “solar panel grants for businesses” are popular search phrases. The official funding scheme covered here is the Non-Domestic Microgen Grant. Our NDMG guide focuses on its formal eligibility and application requirements.
Is the grant 45% of every solar quotation?
No. The enhanced grant uses stepped published amounts, capped at 45% of eligible invoiced cost. Projects with high invoices may still receive less than 45% because the capacity-based amount is lower.
Can I start installation after applying?
Not merely after applying. SEAI specifies that the grant offer must be received before works begin. Seek advice if any preparatory works or material purchases are planned.
Does the grant include a solar battery?
The application guide excludes batteries and other supplemental elements outside the standard solar PV system from eligible costs. Battery economics should be modelled separately.
Will SEAI approve the amount shown by an online calculator?
No. Only SEAI determines actual eligibility, offer amounts and payment. A financial planning calculator cannot inspect premises, contracts, invoices or state-aid conditions.
Do I need to give contact details to use the grant calculator?
No. Our SEAI grant calculator works without entering any personal information. Requesting a shortlist of installers is a separate voluntary step.
Primary evidence: SEAI Non-Domestic Microgen Scheme Application Guide, v1.5 (PDF) and the SEAI scheme website. Reviewed 17 November 2026. The official documents take precedence over this independent explanation.